🎪 Demo Mode — data resets on refresh Reset Demo
powered by Ellevo
Compliance control centre
Live
Demo command centre
Canary Wharf Phase 3
A live high-rise job with cranes, hoists, plant and lifting accessories on hire.
Today’s story
3
issues to show today, 2 faults and 1 overdue exam.
📊
Step 1
Show the live site dashboard
Open faults, overdue exams, and live kit status in one view.
🚫
Step 2
Open the flagged excavator
Tell the story: operative found a failed seatbelt, machine is now do-not-use.
📱
Step 3
Run a clean mobile check
Use the hoist to show how fast a normal pre-use inspection feels on a phone.
⚠️
Step 4
Show an overdue thorough exam
Use the Potain crane to prove Certify catches compliance risk before audit day.
📄
Step 5
Finish with a PDF or QR
Print the QR card or export the audit-ready report to land the enterprise point.
Ops view
Operational to-do list
Compact, scrollable, and ordered with project-manager actions first.
4 items
Confirm tower crane descent complete
Liebherr 542 Tower Crane · TC-LH-2022-0542 · Canary Wharf Phase 3
PM action
Dave Hughes has completed the tower crane descent flow. Confirm it here to clear it from Ops View.
View asset
Confirm tower crane descent complete
Potain MC85 Tower Crane · TC-PT-2019-0085 · Canary Wharf Phase 3
PM action
Dave Hughes has completed the tower crane descent flow. Confirm it here to clear it from Ops View.
View asset
Potain MC85 Tower Crane
TC-PT-2019-0085 · Canary Wharf Phase 3
10d overdue
Thorough examination is overdue and needs booking or updating.
Liebherr 542 Tower Crane
TC-LH-2022-0542 · Canary Wharf Phase 3
5d left
Worth planning now so it doesn’t drop into overdue.
● Live on site
0
✕ Open safety issues
2
⚠ Exams due within 30 days
1
Assets in scope
6
🔍
Operational asset register 6 currently in scope

No assets match your filters

Try adjusting the search or status filter.

Liebherr 542 Tower Crane
TC-LH-2022-0542 Tower Crane Canary Wharf Phase 3
✓ Checked Lifting
Due in 5d
📋 Daily Check
Just now · Dave Hughes
⏱ 9.0h this month · 72.0h total
🔒 Thorough Exam
Due 2026-05-09 (5d)
LOLER 🏢 Lakeside Crane Hire
View asset →
Alimak 650 Construction Hoist
CH-AL-2023-0650 Construction Hoist / Personnel Hoist Canary Wharf Phase 3
✓ Checked Lifting
Exam valid
📋 Daily Check
2d ago · Maria Patel
⏱ 9.0h this month · 63.0h total
🔒 Thorough Exam
Valid · 2026-07-11
LOLER 🏢 Lakeside Crane Hire
View asset →
JCB JS220 Excavator
EX-JCB-2020-0220 Excavator / 360 Canary Wharf Phase 3
✕ Fault Open Work Equipment
Exam valid
⚠ Open issue: Seatbelt buckle not latching — do not operate
📋 Daily Check
17h ago · Kevin Wells
⏱ 0.0h this month · 45.0h total
🔒 Thorough Exam
Valid · 2026-06-25
PUWER 🏢 Lakeside Crane Hire
View asset →
Potain MC85 Tower Crane
TC-PT-2019-0085 Tower Crane Canary Wharf Phase 3
⚠ Exam Overdue Lifting
10d overdue
📋 Daily Check
11d ago · Dave Hughes
⏱ 0.0h this month · 45.0h total
🔒 Thorough Exam
Overdue by 10 days
LOLER 🏢 Lakeside Crane Hire
View asset →
Chain Sling x4
CS-GN-2021-0401 Chain Sling Canary Wharf Phase 3
✓ Checked Accessories
Exam valid
📋 Daily Check
Just now · Rob Foster
⏱ 9.0h this month · 45.0h total
🔒 Thorough Exam
Valid · 2026-08-07
LOLER 🏢 Lakeside Crane Hire
View asset →
Web Sling Set
WS-SS-2024-0102 Web Sling Canary Wharf Phase 3
✕ Fault Open Accessories
Exam valid
⚠ Open issue: Tear in outer sleeve — remove from service
📋 Daily Check
Yesterday · Kevin Wells
⏱ 0.0h this month · 36.0h total
🔒 Thorough Exam
Valid · 2026-09-01
LOLER 🏢 Lakeside Crane Hire
View asset →